Recent years’ audit and enforcement activities (including field verifications by the Regions and entities) have identified multiple instances of discrepancies between documented Equipment and/or Facility Ratings and actual field conditions. The information suggests generally that registered entities with strong controls and change management procedures typically have better data that results in more accurate ratings than those entities that have not taken meaningful steps to develop strong controls, change management focus, and/or validated field conditions with Facility Ratings databases. Those entities are most prone to discrepancies that may result in noncompliance. Because of this, and because of the recurring causes of the issues identified, the ERO Enterprise believes the issue is more widespread than what has been discovered to date.
Issue Summary
The issues identified to date generally involve discrepancies between documented Equipment and/or Facility Ratings and current field conditions. Facility Rating calculations have been incorrect as a result of incorrect ratings for, or missing, multiple types of equipment. For example, the missing or incorrectly rated equipment includes jumpers and risers inside substations, bus bars, current transformers (including delta connected current transformers), circuit breakers, and transmission line conductors. The ERO Enterprise has observed multiple contributing causes related to insufficient processes and lack of controls to prevent these discrepancies. More specifically, the discrepancies tend to occur as the result of the following:
The ERO Enterprise is encouraging entities to perform their own self-assessments to identify and mitigate the Facility Rating issues that may be present on the system. In addition to performing a self-assessment, to further ensure FAC-008 programs are sustainable going forward, entities need to implement sufficient internal controls and, at a minimum, should consider implementing controls related to:
Risk
Incorrect Facility Ratings can pose significant risk to the bulk electric system. In multiple instances, the Facility Ratings have not taken into account the most limiting series element, resulting in large derates in some cases. The discrepancies identified thus far include some significant and widespread discrepancies across the ERO Enterprise. When Facility Ratings are not determined correctly and applied consistently for all applicable Facilities, this can result in equipment operated beyond its capability, causing equipment damage or line sagging beyond its design, resulting in unplanned outages. It is for this reason that Facility Ratings issues were noted as one of the contributing factors to the August 2003 blackout and continues to be an ERO Area of Focus
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |