Each Transmission Operator shall have, and make available upon request, evidence to show it ensured that a Real-Time Assessment was performed at least once every 30 minutes. This evidence could include but is not limited to dated computer logs showing times the assessment was conducted, dated checklists, or other evidence (R13). Arizona Public Service Company (AZPS) received a $132,000 Penalty for a Self-reported Violation of TOP-001-4, "Transmission Operations", R13. Due to configuration issues and uncoordinated troubleshooting efforts, AZPS's Energy Management System (EMS) lost visibility to the remote thermal unit (RTU) and Inter-Control Center Communications Protocol (ICCP) data between AZPS and its Reliability Coordinator (RC) and neighboring entities. The data lapse impacted the performance of the Real-time Contingency Analysis (RTCA) tool which stopped solving due to the loss of the RTU data. The RTCA is an aspect of AZPS’s Real Time Assessment (RTA), and AZPS System Operators (SOs) and RC lost the ability to perform a manual RTA in accordance with its procedures. TOP-001 Requirement R13 (as it currently exists) was in response to a Notice of Proposed Rule Making (NOPR) concerning Real-time analysis responsibilities for Transmission Operators. The Transmission Operator’s Operating Plan must describe how to perform the Real-time Assessment. The Operating Plan should contain instructions as to how to perform Operational Planning Analysis and Real-time Assessment with detailed instructions and timing requirements as to how to adapt to conditions where processes, procedures, and automated software systems are not available (if used). This could include instructions such as an indication that no actions may be required if system conditions have not changed significantly and that previous Contingency analysis or Real-time Assessments may be used in such a situation.
Description:
On April 16, 2019, AZPS replaced a pair of non-CIP Energy Management System (EMS) frame firewalls as part of a planned outage change at the primary Control Center (PCC). Due to configuration issues, and uncoordinated troubleshooting efforts, on April 17, 2019, at 7:38 p.m., the EMS lost visibility to remote thermal unit (RTU) and Inter-Control Center Communications Protocol (ICCP) data between AZPS and its Reliability Coordinator (RC) and neighboring entities. The data lapse impacted the performance of the Real-time Contingency Analysis (RTCA) tool which stopped solving due to the loss of the RTU data. The RTCA is an aspect of AZPS’s Real Time Assessment (RTA), and AZPS System Operators (SOs) and RC lost the ability to perform a manual RTA in accordance with its procedures. Thus, AZPS was unable to perform a Real-time assessment (RTA) which required an examination of existing and expected system conditions, conducted by collecting and reviewing immediately available data.
In addition, AZPS notified its neighboring entities of the condition and specifically confirmed the loss of the ICCP data with its RC and other neighboring entities. AZPS’s Balancing Authority (BA) function notified its generation units to change to local control and maintain their current output. Because the SOs did not have visibility of the system including RTCA, the PCC monitored the system in Real-time via field personnel and managed the BA responsibilities through manual checkout every 15 minutes along with adjacent BAs.
AZPS activated its CIP-009-6 Recovery Plan and identified lessons learned and updated the Recovery Plan to include a peer check. AZPS completed the required steps for CIP-009-6 R2 and R3, thus CIP-009-6 R1-R3 were not at issue. AZPS used a CIP head end firewall as an attempt to troubleshoot during the instant violation, but the failover did not require Change Management protocols. Therefore, WECC determined that AZPS did not have any additional instances of potential noncompliance with CIP-009-6 R1-R3 nor CIP-010-2 R1 associated with the instant violation.
At 8:21 p.m., AZPS restored connectivity between the router and the new EMS frame firewalls. At 9:44 p..m., the EMS regained visibility and the RTCA began solving with the return of the RTU data. At 10:30 p.m., the ICCP services were restored for EMS, improving the functionality of the RTCA solution.
The EMS outage began at 7:38 p.m. and ended at 9:44 p.m., for a total of two hours and six minutes. The ICCP outage began at 7:38 PM and ended at 10:29 p.m. for a total of two hours and 51 minutes. The RTCA did not solve during the EMS outage of 2 hours and six minutes and the RTCA results were not verified during the ICCP outage of 2 hours and 51 minutes.
The root cause of the violation was attributed to a lack of coordinated efforts in AZPS’s incident response when it did not follow established decision trees and its incident management procedure, which resulted in an EMS outage, ICCP outage and RTCA not solving.
The violation began on April 17, 2019 at 8:09 p.m., when AZPS did not ensure that an RTA was performed through its RTCA, and ended on April 17, 2019 at 11:35 p.m., when AZPS was able to perform an RTA, for a total of three hours and 26 minutes (206 minutes over the 30-minute requirement).
Mitigation
To mitigate this violation, AZPS has performed the following actions:
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |